|
|
Canada, BC, Range 1 Coast Land, Lower Mainland |
|
|
On 12 May 2015, Alterra Power Corp. and the Klahoose First Nation announced that they will be building a 15 MW hydroelectric power plant on the Tahumming River the near the Toba Montrose and Jimmie Creek projects |
|
| |
| |
| Source : | | |
Lattitude: | 50.70 |
|
Longitude: | -124.50 | |
Elevation: | 97 | [m] | Zone: | 15 | |
|
|
| |
| Mouth : | Toba Inlet | |
Lattitude: | 50.50 | |
Longitude: | -124.40 | |
Zone: | 15 | |
|
|
| |
|
|
| |
|
|
| |
Tributary | Lat/Lon | | | Connected | |
| | | | |
Toba Inlet | 50.4 -124.6 | | Mouth | |
|
Tributary | Lat/Lon | | | Connected | |
| | | | |
|
| |
|
|